Skip to content

For real estate investors

Micro Development in Wilmington, NC

Put more than one use on one lot. An office at the front, rental ADUs behind it, and one team handling feasibility, design, permitting, and construction.

Modern low-rise office buildings along a landscaped walkway
One team, one contract
Design-build firm
NC General Contractor #L.101491
Unlimited license
Building across southeastern NC
Wilmington-based
[Label to confirm]
[Stat]

The concept

What is a micro development?

A micro development gets more out of a single lot by combining uses. The flagship example is an office building at the front of the lot with two rental ADUs behind it. The office faces the street, the ADUs sit quietly in back, and the whole site is planned together from the start.

  • Mixed uses on one lot
  • Planned as a single project
  • One builder from feasibility through delivery
Micro development site planOne lot seen from above. An office building sits at the street with parking beside it. A shared drive leads to two rental ADUs at the back of the lot.ADU 1Rental unitADU 2Rental unitOFFICESTREET
Illustrative layout. Every lot is different, and zoning decides what fits.

The investor angle

Income-producing property, planned from the lot up

We can tell you what a site can hold and what it takes to build it. Returns depend on your market, your financing, and your tenants, so we leave those projections to you and your advisors.

Talk through a site

Better lot utilization

Mixed uses planned together from the start, so the site works harder than a single building on the same land.

Income-producing property

Office and rental units on one parcel give you more than one use to lease.

Feasibility before design

Zoning, utilities, and site constraints get reviewed first, so you know what the lot can hold before you commit to plans.

Scale

From one lot to a mid-size development

We focus on the in-between projects: bigger than one house, smaller than what a large commercial developer takes on.

  • Single-lot projects

    Mixed uses on one parcel, like an office with rental ADUs behind it.

  • Small multi-unit projects

    Several units planned and built together on one site.

  • Mid-size developments

    Multi-unit projects that need an unlimited license, with design and construction under one contract.

How it works

Five steps, one team

One contract and one point of contact, from the first conversation to delivery.

  1. Step 1

    Consultation & feasibility

    We walk the site, review your goals and budget range, and check zoning and utilities before anything gets drawn.

  2. Step 2

    Design & engineering

    Plans, engineering, and pricing come together under one roof, so the design stays tied to what it costs to build.

  3. Step 3

    Permitting

    We prepare and file the submittals and work through review with Wilmington and New Hanover County.

  4. Step 4

    Construction

    The same team that designed the project builds it, under one contract and with one point of contact.

  5. Step 5

    Delivery

    Final inspections, closeout documents, and a walkthrough. You receive a finished building ready to use.

Our work

Recent projects

  • Placeholder: office building exterior
    [Project name]Office and ADUs
  • Placeholder: construction in progress
    [Project name]Multi-unit
  • Placeholder: rental ADU
    [Project name]Rental ADU

Have a lot in mind?

Send us the address or the area you are looking at. We will start with what the site can support.

FAQ

Micro development questions

How do I know if my lot works for a micro development?

That is what the feasibility stage answers. We review zoning, setbacks, utilities, access, and site constraints, then tell you what the lot can realistically hold.

Does zoning allow an office and ADUs on the same lot?

It depends on the lot and the jurisdiction. Zoning is the first thing we check, before any design work starts.

Can you review a lot before I buy it?

Yes. We can review a lot you own, have under contract, or are considering.

How long does a micro development take?

Timelines depend on the scope, the site, and permitting. We build the schedule during design, so you see the full timeline before construction starts.

Do you guarantee a return on the project?

No. We design and build the project. Returns depend on your market, financing, and tenants, so run those numbers with your own advisors.

How big a project can you take on?

Our unlimited NC General Contractor License means there is no cap on project size. Most micro developments run from a single lot up to mid-size multi-unit projects.

Start your project

Tell us about your project

Share a few details and we will follow up to talk through scope, site, and schedule.